Thinking about a custom home or teardown on an estate lot in Town and Country? Before you fall in love with a site plan, you need to understand how local zoning, design review, and site constraints shape what you can build. With the right roadmap, you can protect your budget and timeline while designing the home you want.

This guide walks you through the essentials for Town and Country estate lots: how to identify your zoning, what rules typically apply, the approval path, common pitfalls, and a practical checklist you can use from first look to permit. Let’s dive in.

What estate zoning means

Estate residential districts in Town and Country are designed for low-density, single-family living on larger lots. Your first step is to confirm the exact zoning district for the parcel on the City’s zoning map and read the district’s purpose and permitted uses.

Once you confirm the district, focus on:

  • Permitted uses and accessory uses.
  • Minimum lot area and frontage requirements.
  • Dimensional standards that define your buildable envelope.

Because municipal codes evolve, verify the current standards and definitions with City planning staff before you draw plans.

Buildable envelope basics

Setbacks define how far your home must sit from the front, rear, and side property lines. Corner lots often have two front-type setbacks, which can narrow your building width more than expected. Some districts treat attached garages differently than detached accessory buildings, so review both.

Most estate districts also cap lot coverage and may limit impervious surface like driveways, patios, and pool decks. These thresholds can trigger stormwater controls and influence where you place hardscape. Confirm whether the front setback is measured from the property line or the street right of way, since that changes your siting.

Height, slope, and massing

Town and Country’s height rules are measured by a specific method defined in the municipal code. Confirm whether height is measured to a midpoint or peak and from which grade. On sloped lots, height calculations and finished grade choices can change the apparent massing and compliance.

Ask your design team to test several massing options early so you can avoid redesign late in the process.

Trees, landscape, and site work

Expect tree preservation requirements when building on an estate lot. Many projects require a tree survey and an arborist’s inventory that documents species, diameter at breast height (DBH), and health. Removal above certain DBH thresholds can require permits and replacement or mitigation calibrated to the tree sizes removed.

Prepare a tree protection plan that includes fencing and root protection during construction. Larger projects or increases in impervious area often need landscape buffers and planting plans as part of site plan review.

Grading, erosion, and stormwater

Grading permits and erosion control plans are common where you disturb larger areas. If your design adds impervious surface beyond certain thresholds, the City may require engineered stormwater detention or other best practices. Work with a civil engineer at schematic design to align your house footprint, driveway layout, and drainage before you finalize architecture.

Easements, utilities, and floodplain

Review title work and the survey for utility, drainage, and conservation easements that limit where you can build. Check FEMA Flood Insurance Rate Maps to see if any portion of the lot falls within a floodplain or local floodway. These factors can reduce the usable site area or add conditions to your plans.

Confirm public water and sanitary sewer availability early. If sewer is not available, you will need to evaluate septic feasibility and local standards before you proceed.

Private rules that still matter

Recorded subdivision covenants and HOA rules can be just as influential as City zoning. These documents may address architectural character, minimum house sizes, driveway materials, fence standards, and tree rules. Request plats and covenants during early due diligence and make sure your plans satisfy both City and private requirements.

When a variance may be needed

If dimensional standards or site conditions leave you without a reasonable buildable envelope, you may consider a variance from the Board of Adjustment. Variances are discretionary and require proof of unnecessary hardship. They involve public notice and a hearing, so plan for added time and design alternatives if relief is not granted.

Typical approval path

Below is a practical sequence you can expect for a new custom home or teardown on an estate lot in Town and Country. Timelines vary by project complexity and submittal quality.

Pre-offer feasibility

  • Pull the parcel’s zoning district, zoning map, and the applicable code sections.
  • Review plats, recorded covenants, legal description, and visible constraints.
  • Check FEMA flood maps, county GIS for utilities, and look for easements or encroachments.

Offer contingencies

  • Add contingencies for a survey, title review, soils or geotechnical report, and an arborist’s inventory.
  • Include a City approvals contingency if you anticipate variances or nonconformities.

Due diligence investigations

  • Hire a licensed surveyor for a current boundary survey, easements, and tree locations.
  • Engage an arborist for an inventory with DBH and health conditions.
  • Retain a civil engineer for a preliminary site plan, grading concept, and utility routing.
  • Order geotechnical borings, especially for unknown soils or sloped terrain.
  • Complete title review for easements and covenants.

Pre-application meeting

  • Meet with City planning and building staff. Confirm submittal requirements, whether Architectural Review Board (ARB) review applies, and likely triggers such as tree permits or stormwater calculations.
  • Clarify fees, bonds, and expected timelines.

ARB concept review

  • If your neighborhood falls under ARB authority, submit conceptual architecture, materials, and site layout for feedback.
  • ARB comments can influence siting, massing, and exterior materials, so engage early.

Formal submittals

  • Provide full site plan, landscape and tree protection plans, grading and erosion control, stormwater calculations if required, and building plans.
  • Planning Commission or site plan review may be required for certain projects or thresholds.
  • If variances are needed, apply to the Board of Adjustment. Allow time for public notice and hearing.

Permits and preconstruction

  • Obtain the building permit, tree removal or grading permits, utility permits, and demolition permit for teardowns.
  • Some approvals may require performance guarantees or bonds before permits are released.

Construction and inspections

  • Expect periodic inspections for foundation, framing, mechanicals, and final.
  • Maintain tree protection and erosion control until the site is stabilized.

Certificate of occupancy

  • After final inspections and signoffs from all departments, the City issues the certificate of occupancy.

Typical durations

  • Straightforward rebuild on a compliant lot with no ARB and minimal site work: roughly 6 to 12 weeks from complete submittal to permit, plus 6 to 12 months of construction.
  • Complex estate lot with tree preservation, grading, stormwater, ARB review, or variances: several months for approvals, followed by a longer construction window.

Common pitfalls to avoid

  • Assuming standard setback or coverage numbers. Always confirm the current code section for your district.
  • Overlooking easements or floodplain that shrink your buildable area. Review the survey, title, county GIS, and FEMA maps early.
  • Underestimating tree preservation and replacement obligations. Budget using an arborist’s early inventory.
  • Triggering stormwater requirements late. Involve a civil engineer at schematic design.
  • Treating ARB as cosmetic. ARB can require substantive changes to siting and materials; bring neighborhood context and precedents to reviews.
  • Banking on quick variances. Variances are discretionary and add time; design to avoid them when feasible.

One-page checklist

Use this at each stage to keep your project on track.

Before bidding or purchasing

  • Confirm the zoning district and pull the relevant code sections and zoning map.
  • Request a zoning compliance letter or pre-application memo from Planning if available.
  • Order an ALTA or boundary survey showing easements, improvements, and setback lines.
  • Obtain recorded plats, covenants, and HOA rules.
  • Check FEMA flood maps and county GIS for utilities and public easements.
  • Commission a tree inventory and preliminary arborist report.
  • Verify public sewer and water service or evaluate septic standards if needed.

Before submitting plans

  • Hire an architect experienced with Town and Country and ARB expectations.
  • Retain a civil engineer for grading, stormwater, and erosion control plans.
  • Complete geotechnical borings for soil and slope conditions.
  • Prepare a tree protection and replacement plan that aligns with City thresholds.
  • Collect context photos of surrounding homes to support ARB submittals.

Submitting to the City

  • Ask staff for the current application checklist and provide all requested items.
  • Confirm any public notice and hearing requirements for Planning Commission or variances.
  • Review the fee schedule for plan review, permits, inspections, and any bonds.

During construction

  • Maintain and document tree protection fencing with photos and logs.
  • Keep erosion and sediment control measures in place until stabilization.
  • Coordinate utility connections early to avoid delays at the end of the project.

Work with a local advisor

Estate-lot projects move fastest when you assemble the right team early and verify every rule that affects your design. If you want an experienced advocate who understands Town and Country’s estate neighborhoods, ARB expectations, and the due diligence path from first look to keys in hand, connect with Aimee Simpson for a private consultation. You will get discreet, white-glove guidance tailored to your goals and a clear plan to move forward with confidence.

FAQs

What is estate lot zoning in Town and Country?

  • Estate zoning supports low-density single-family homes on larger lots with rules on uses, lot size, setbacks, height, and coverage; confirm specifics with City staff.

How do setbacks affect my home design?

  • Setbacks shape the buildable envelope and can vary on corner lots or for garages and accessory buildings, so verify the exact distances before finalizing the footprint.

Do I need ARB approval for my project?

  • Many neighborhoods require Architectural Review Board review of exterior design, materials, massing, and site layout; ask staff when ARB is triggered and at what stage.

What should I check before making an offer?

  • Confirm zoning, review plats and covenants, check FEMA flood status and county utilities, and order a current survey and preliminary arborist review.

How long do permits typically take?

  • Simple, compliant rebuilds can see permits in roughly 6 to 12 weeks after complete submittal, while complex estate lots can take several months for approvals.

When is a variance the right path?

  • Consider a variance if standards leave no reasonable buildable envelope, but plan for public hearings and be ready with design alternatives if relief is not granted.

Work With Aimee

Aimee is a multi-million dollar producer and selling Luxury since 1996. Specializing in the central corridor including Ladue, Clayton, Huntleigh, Frontenac and Town & County. She provides White-Glove service throughout the entire real estate process, representing both buyers and sellers. Buying, Selling or Relocating...Are you Ready to Make a Move? Selling Luxury for over 29 years - Experience the Difference